Answer:2.28571429 dollars. 4/1.75= 2.28571429, therefore showing how much one will cost.
Step-by-step explanation:
This the problem with non-SI units, conversion is such a
nightmare. Anyhow, given $98 per cu.yd and total cost of $72.59, the volume of
concrete is 0.7404 cu.yd. Converting the given dimensions to yards:
3.33 yd x (1/12) yd
Solving for the unknown dimension given volume and 2 other
dimensions:
.7407 cu. Yd = (3.333 yd)(1/12 yd)(x)
X = 2.6678 yd or 8 feet
Our current equation is:
-ax + 3b > 5
Our objective is to solve for x, so let's first get -ax by itself.
Subtract 3b from both sides.
-ax > -3b + 5
Now, we have -a multiplying x, so we need to perform the opposite order of operations (like previously shown with 3b).
Divide both sides by -a.
Remember to flip the inequality when multiplying or dividing by a negative.
x <_ (-3b + 5)/-a is your final answer.
I hope this helps!
Answer:
It's about 20 feet
Step-by-step explanation: