Answer:
-37.5 m
Step-by-step explanation:
If we assume that "one full day" is 24 hours, then 15 hours represents the fraction 15/24 of a day. Since the drilling rate was constant, and was presumed to start from a height of 0, the height after 15 hours is that fraction of the day's work:
... (15/24)×(-60 m) = -37.5 m
Answer:
3.6 litres
Step-by-step explanation:
1 bottle = 450ml
8 bottles = 450 × 8
= 3600ml
1000ml = 1 litre
3600ml = 3.6 litres (3600÷1000)
1 x 9, 3 x 3, 9 x 1
1 and 9 are a factor pair of 9 since 1 x 9= 9
3 and 3 are a factor pair of 9 since 3 x 3= 9
9 and 1 are a factor pair of 9 since 9 x 1= 9
Answer is B, 21.6
Let me know if you need an explanation
2m = 25/2
m= 25/2 divided by 2
m= 25/4
3m= 25/4 x 3
3m= 75/4
so she does 3 miles in 18 3/4 hours