Answer:
$512.90 should be budgeted for weekly repairs and maintenance so that the probability the budgeted amount will be exceeded in a given week is only 0.05
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
Normally distributed with mean $480 and standard deviation $20.
This means that 
How much should be budgeted for weekly repairs and maintenance so that the probability the budgeted amount will be exceeded in a given week is only 0.05?
This is the 100 - 5 = 95th percentile, which is X when Z has a pvalue of 0.95, so X when Z = 1.645.




$512.90 should be budgeted for weekly repairs and maintenance so that the probability the budgeted amount will be exceeded in a given week is only 0.05
The value of the 7 in the hundredths place is 10 the value of the 7 in the thousandths place. The value of the 7 in the tens place is 10 times the value of the 7 in the ones place. The value of the 7 in the hundreds place is 10 times the value of the 7 in the tens place.
Hope this helped!
Nate
D. two dice would have 12 faces total just alone 3 combinations or 6 faces shown to add up to 7 1+6=7 3+4=7 5+2
6+5=7 is the only combination that you can get to add up to 11
so A.1/4
Answer:
x = 7, y = 24
Step-by-step explanation:
23x -16 + 8x - 21 = 180 because they are supplementary angles
31x - 37 = 180
31x = 217
x = 7
23(7)-16 = 7y - 23 because they are vertical angles
168 = 7y
y = 24