Answer:
Option C) 146.5
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 130 weeks
Standard Deviation, σ = 10 weeks
We are given that the distribution of completion time is a bell shaped distribution that is a normal distribution.
Formula:
P(X<x) = 0.95
We have to find the value of x such that the probability is 0.95
P(X < x)
Calculation the value from standard normal z table, we have,
The project should be completed in 146.5 weeks or less.
Hence, 146.5 weeks should be set the due date such that there is a 95 percent chance that the project will be finished by this time.
M<CDE = <CFD and <EFD = 90
<EFD = <BFC
<CFD = <AFB
m<EFB = <BFC + <CDE
m<EFB = 69 + 90
m<EFB = 159
Answer:28.071
Step-by-step explanation:
Given
vector component is (15,8)
i.e. its x component is 15 from origin and y component is 8 m
So angle made by vector with x axis is
We are given the function <span>f(x)=sqrt of (4sinx+2) and is asked to find the first derivative of the function when x is equal to zero.
</span><span>f(x)=sqrt of (4sinx+2)
f'(x) = 0.5 </span><span>(4sinx+2) ^ -0.5 * (4cosx)
</span>f'(0) = 0.5 <span>(4sin0+2) ^ -0.5 * (4cos0)
</span>f'(0) = 0.5 <span>(0+2) ^ -0.5 * (4*1)
</span>f'(x) = 0.5 (2) ^ -0.5 * (4)
f'(x) = -.1.65