Eric took 20 hours to do the job alone.
<u>Step-by-step explanation</u>:
<u>Given </u>:
- Total work = 75 packages
- Joe took 5 hours to complete the total work.
The amount of work Joe alone can do per hour = 75/5 = 15 packages.
The amount of work Joe and Eric together do per hour = 75/4 = 18.75
The amount of work Eric alone can do per hour = 18.75 - 15 = 3.75
The time Eric took to complete the entire work = 75 / 3.75 = 20 hours.
Answer: 377.2 miles
Step-by-step explanation:
m x g. / 18.4 x 20.5
Let
x-------------> <span>the length of a rectangle
y-------------> the </span>width of a rectangle
we know that
x+y=130-----------> equation 1
and
x=1.6y--------------> equation 2
<span>I substitute 2 in 1
(1.6y)+y=130-------------> 2.6y=130------------> y=130/2.6------> y=50 ft
x=1.6y--------> x=1.6*50---------> x=80 ft
the answer is
</span>the length is 80 ft
the width is 50ft
The answer to this is 10.
C=10
Answer:
y = 2
Step-by-step explanation:
Given
y + 7 = 9 ( subtract 7 from both sides )
y = 2