Answer:
The risk consequence of both activities is 1.6 months.
Step-by-step explanation:
We can define a randome variable D: total delay time for the project, and calculate its expected value.
This would be the risk consequence of both activities.
The expected delay time for the project is the sum of the expected delay for task A plus the expected delay for task B. It is assumed the likelihood of a problem in any task is independent of the other.
Then, each expected delay for a task is equal to the probability of a problem multiplied by the consequence (delay time).

The risk consequence of both activities is 1.6 months.
Answer:
the would be m=4
Step-by-step explanation:
Answer:
4.31 as said
Step-by-step explanation:
If PQ=7 and QR=10,
P=(7/Q) and R=(10/Q)
Therefore:
PR=(7/Q)(10/Q)
=(70)/Q²
The first thing that you do when simplifying an expression with the variable’s values known is to distribute the values. EXAMPLE:
3(7x+9)+6(-16x-40); distribute:
21x+27-96x-240; combine like terms:
(21x+(-96x))+(27+(-240))——-> -75x-213; now plug in the values and solve: -75(6)-213=-663