Answer:
In a perpetual inventory system:
<em>1)Merchandising transactions are recorded as they occur</em>
<em>3) Entries are made in the Cost of Goods Sold account whenever merchandise is purchased or sold</em>
<em>4)The need to take physical inventory is eliminated</em>
Explanation:
In a perpetual inventory system: Merchandising transactions are recorded as they occur.
In periodic system :No effort is made to record the Cost of Goods Sold until year-end. Entries are done at the year end.
In a perpetual inventory system:Entries are made in the Cost of Goods Sold account whenever merchandise is purchased or sold. Costs are assigned to the cost of goods sold each time a sale occurs in a perpetual inventory system.
In a perpetual inventory system:The need to take physical inventory is eliminated.But still it is done to assure the ending inventory.
In periodic system : the physical count cannot be eliminated.
Answer:
5.7255
Explanation:
From the given information:
The joint density function of and is:
Area(A):
= 34
The limits are:
Also;
∴
To find;
I don't know if I'm correct or if I'm wrong but correct me, They should strengthen your transcript seems more reasonable.
It is not appropriate to consider this in the physical design of a data center: <em>D Design of authorization tables for operating system access.</em>
The physical design of a data center has nothing to do with the design of authorization tables for operating system access, which is mainly a logical control device, and not a physical control.
This factor is actually taken care of after the data center has been located, designed, built, and fully equipped for operation. Moreover, the design of authorization tables for operating system access has something to do with logical controls and not physical controls.
However, during the physical design, there is always the need to consider the inclusion of an uninterruptible power supply system, surge protector, bio-metric access systems, and the potential risks from railroad lines and highways.
Thus, the issue that should not be considered in the physical design of a data center is the design of authorization tables for operating system access.
Learn more about the physical design of a data center here: brainly.com/question/14517816
The answer is A.
Deadline is the time at which something must be completed.
Hope this helps!