Answer:
The correct answer to the following question will be Option b ( IT infrastructure).
Explanation:
This refers to either the integrated devices, applications, network infrastructure, as well as facilities needed by an organization This system to function, run, and maintain.
- Your technology infrastructure seems to be the nervous system, which is accountable for supplying end customers with a streamlined operation.
- Total control of both your operating system infrastructure ensures you can guarantee the channel's safety is tracked.
Therefore, it will be a part of the design of Mary.
Answer:
Ctrl+Alt+Del
Explanation:
It will take you to the task manager and you can highlight the program that is frozen, right click on it and select end task. Or hard reboot as a last resort.
Answer:
The correct answer to the following question will be Option B (Policy).
Explanation:
- The Policy is a systematic set of rules for driving policies and obtaining rational results. It is a declaration of intent and is applied as a process or protocol.
- Policies are usually implemented by the governing body throughout the corporation.
- It was the feature of Information assurance management, which sought to dictate those activities throughout the organization via a collection of institutional requirements.
Therefore, Option B is the right answer.
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Answer:
Update the unit firmware.
Explanation:
Updating unit firmware means update the information related to the network that is newly installed on the wireless router. The purpose of this change is to update the devices with new network alterations to work with efficiency and better security. As things are updating on daily basis, so the manufacturer makes the devices, reprogram able to meet the requirement of the future by updating the program in firmware unit. By updating device means this will be to fix the bugs that can be occur in modern era. This will make the device more secure.