Answer:
w < 8 meters ( w must be greater than 0 because length cannot be 0)
Step-by-step explanation:
One side with building is 23 meters, the other opposite side also will be 23 meters (with rope).
Let width (remaining 2 sides) be "w", he has AT MOST 39 meters of rope, so we can write:
Rope Needed = 23 + 2w < 39
Simplifying:
The range of possible values of w is meters (of course w has to be greater than 0)
Answer:
$1756
Step-by-step explanation:
1. More = Addition
2. Twice = Multiplication by 2
3. Tuition costs $100 more than twice room and board
Tuition = 2x + 100
$2584 = (2x + 100) + x
$2584 = 3x + 100
4. Subtract 100 on both sides: $2484 = 3x
5. Divide both sides by 3: $828 = x
6. Plug it in to the tuition equation: Tuition = 2(828) + 100
= $1756
Check Work: (828*2) + 100 = $1756
$1756 + 828 = $2584
Answer:
1) His total commission is $1,234.3
2) The purchase of the car is $24,790.
Step-by-step explanation:
1) 21640*0.02= 432.8+ 250= 682.8
15075*0.02= 301.5+ 250= 551.5
682.8+ 551.5= 1,234.3
2) 745.8- 250= 495.8/ 0.02= 24,790
The average rate of change of credit card is $ 401.79 /year.
<h3>
What is Average Rate?</h3>
- A single rate that is a weighted average of the different rates that are applicable to property in various locations.
- An average is a single number calculated as the average of a set of numbers, typically calculated as the sum of the numbers divided by the total number of numbers in the set (the arithmetic mean).
<u>Solution</u>
The difference of credit card debt between the year 2006 and 1992 = 8900 - 3275 = $5625
The difference of years between the year 2006 and 1992 = 2006 - 1992 = 14
average rate of change of credit card debt with respect to time =
average rate = = $ 401.79 / year
know more about average numerical brainly.com/question/18296887
#SPJ4
<span>they built 2.22 km per day I think</span>