Answer:
18-3*5+32÷4
=18-3*5+8
=18-15+8
=26-15
=11
Step-by-step explanation:
use BODMAS rule
Answer:
y=2x+13
Step-by-step explanation:
Gradient of parallel lines are equal and in the equation,y=2x-5, 2 represents the gradient.
Therefore the gradient of the other line will also be 2.
Introduce another point (x,y) and then equate using the gradient as follows:
y-1/x--6=2
y-1/x+6=2
Cross multiplication;
(y-1)=2(x+6)
y-1=2x+12
y=2x+12+1
y=2x+13
Answer:
48,841,380.8
Step-by-step:
find 12% of 14,365,112= 1,723,813.44
then find 1,723,813.44×20= 34,476,268.8
then 34,476,268.8+14,365,112=48,841,380.8
Answer:
compound interest would be,
1495.91
and simple interest would be,
1470
Step-by-step explanation:
compound interest would look like,
1200 x 1.045 x 1.045 x 1.045 x 1.045 x 1.045
and simple interest would look like,
1200 x 0.045 = 54 = 4.5%
54 x 5 = 270
1200 + 270 = 1470
Answer:
$425.6 should be budgeted for weekly repairs and maintenance.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean $400 and standard deviation $20.
This means that 
How much should be budgeted for weekly repairs and maintenance to provide that the probability the budgeted amount will be exceeded in a given week is only 0.1?
This is the 100 - 10 = 90th percentile, which is X when Z has a p-value of 0.9, so X when Z = 1.28.




$425.6 should be budgeted for weekly repairs and maintenance.