Answer:
$1.96
Explanation:
The disparity between the delivery price and the actual forward price discounted at the specified discount rate will be the current value.
Thus, it can be calculated by using the following formula:
Answer:
B. Accept X and reject Y
Explanation:
Here are the options
A. Accept both X and Y
B. Accept X and reject Y
C. Reject X and accept Y
D. Reject both X and Y
E. The answer cannot be determined based on the information provided
the project should be accepted if the WACC of the department is less than the rate of return on the project
WACC = weight of equity x cost of equity + weight of debt x after tax cost of debt
weight of debt = D / (D + E) = 0.45E /1.45E
weight of equity = E / (D + E) = E / 1.45E
WACC = ( 0.45E /1.45E) x (5.1) + ( E / 1.45E) x 14.7
= 5.1 x (0.45/1.45) + 14.7 x (1/1.45)
=1.583 + 10.138
11.72%
Division X's WACC = 11.72% - 0.5% = 11.22%
Division Y's WACC = 11.72% + 1% = 12.72%
The rate of return of Division Y's project is 12.3%. Thus, division Y's project should not be accepted
the rate of return of Division X's project is 11.64%. Thus, division X's project should be accepted
Answer:
1. The testing cost before putting the equipment into production
2. The costs of transportation
3. The costs of installation
Explanation:
An acquisition cost, also referred to as the cost of acquisition, is the total cost that a company made in the acquisition of an equipment. It shows the true amount that was paid for the acquisition of the equipment before sales tax was applied.
1. testing costs before putting the equipment into production
2. costs of transportation
3. costs of installation
Should be included in the cost of acquisition of a new equipment.
Answer:$22.50
Explanation: I took the quiz and got it right
Explanation:
Let angle y be the unknown angle inside the triangle.
given
y + 87 + 34 = 180 (sum of angles in a triangle)
given y + z = 180 (angles on same straight line)