1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
fgiga [73]
3 years ago
10

(CO 3) On the production line the company finds that 85.6% of products are made correctly. You are responsible for quality contr

ol and take batches of 30 products from the line and test them. What number of the 30 being incorrectly made would cause you to shut down production?
Mathematics
1 answer:
egoroff_w [7]3 years ago
7 0

Answer and explanation:

There should be 85.6% correctly made products

If there is less than 85.6% correctly made products then production would be shut down

therefore 100-85.6= 14.4% of products can be incorrectly made and not more than that

In 30 batches 14.4% =0.144*30=4.32 products

Therefore there must not be more than 4.32 products incorrectly made in a batch of 30 else production is shut down

You might be interested in
These are the first four terms of a sequence.
DedPeter [7]

Answer:

2+3n

Step-by-step explanation:

This question is based on a topic called sequence and series,under which we have the arithmetic progression

The formula for arithmetic progression is a+(n-1)d

In which a is the first number,n is the nth term and d is the difference

Back to the question

a=5,n=it's not given,d=3

Using the general formula

a+(n-1)d

5+(n-1)3

Open the bracket first

5+3n-3

Collect like terms

5-3+3n

2+3n

The answer is 2+3n

And it can be solved further only if we are given the value of n...the question even stated that we should solve in terms of n

Therefore the answer is 2+3n

3 0
3 years ago
Read 2 more answers
Which of the following cosine functions has a period of 3π?
skelet666 [1.2K]

Answer:

y = cos 2/3 x

Step-by-step explanation:

7 0
3 years ago
Simplify fully (2x-1)(2x+1)​
aleksandrvk [35]
4x^2 - 1 should be right
7 0
3 years ago
If the subspace of all solutions of Ax 0 has a basis consisting of vectors and if A is a ​matrix, what is the rank of​ A
Nuetrik [128]

Question: If the subspace of all solutions of

Ax = 0

has a basis consisting of vectors and if A is a ​matrix, what is the rank of​ A.

Note: The rank of A can only be determined if the dimension of the matrix A is given, and the number of vectors is known. Here in this question, neither the dimension, nor the number of vectors is given.

Assume: The number of vectors is 3, and the dimension is 5 × 8.

Answer:

The rank of the matrix A is 5.

Step-by-step explanation:

In the standard basis of the linear transformation:

f : R^8 → R^5, x↦Ax

the matrix A is a representation.

and the dimension of kernel of A, written as dim(kerA) is 3.

By the rank-nullity theorem, rank of matrix A is equal to the subtraction of the dimension of the kernel of A from the dimension of R^8.

That is:

rank(A) = dim(R^8) - dim(kerA)

= 8 - 3

= 5

4 0
4 years ago
Deandre wants to earn at least $30 trimming trees. He charges $7 per hour and pays $5 in equipment fees. What are the possible n
exis [7]
8 hours for the possible numbers of house
5 0
3 years ago
Other questions:
  • The diagram shows a 5 cm x 5 cm x 5 cm cube,
    13·1 answer
  • Over which interval is the graph of f(x) = –x2 + 3x + 8 increasing?
    15·2 answers
  • The figure below is a square pyramid. Which of the following could not be a cross section in the figure?
    12·2 answers
  • 864 divided by 76 plz answer soon
    10·2 answers
  • Iona has a previous balance of &754 on a credit card with a 16.8% APR compounded monthly. If she made a payment of $50 this
    12·1 answer
  • Ginny has 3 pink tops 4 blue tops and 7 black tops. She has 5 black pants 4pairs of blue jeans and 2 pair of red pants. How many
    7·1 answer
  • A shopkeeper had 440 apples 128 of the apples were rotten he sought all the good apples at four apples for three dollars how muc
    14·1 answer
  • Todd Lyle worked Monday through Friday from 8:00 A.M. to 5:00 P,M. with an hour off for lunch. He is paid $10,50 an hour. Find h
    15·1 answer
  • 3. A machine in a factory makes chairs at a rate of 2 chairs every 10 minutes. - How much time does the machine take to make 5 c
    15·1 answer
  • 9х2 - 2x – 1 = 0<img src="https://tex.z-dn.net/?f=2x%20%7B%20%7D%5E%7B2%7D%20%20-%202x%20-%201%20%3D%200" id="TexFormula1" title
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!