Answer:
True
Explanation:
if you are able to manage time well, then that means you have good time management skills
Answer: EMI(Electromagnetic interference)
RFI(Radio frequency interference)
Explanation: Electromagnetic interference is the emission of the electromagnetic signal that can disturb the working of the other device.It invokes the disturbance that can create error, under-performance mechanism,distortion etc in the equipment.
Radio-frequency interference(RFI) is the radio-frequency signal that interferes the other device by creating noise and distortion. This leads to breaking of the operation and data error.
Other options are incorrect because cross talk is referred as undesired communication between signal ,attenuation is the degradation in the amplitude of any signal and extended length of cabling is increasing the length of the cable.Thus the correct answer is RFI and EMI.
Answer:
Round trip times required = log2N
Explanation:
The round-trip times required before TCP can send N segments using a slow start is log2N. we can arrive at this by looking at the mode of operation of TCP which is at the 1st time of using a TCP it starts the congestion window as 1 then it sends an initial segment. When the acknowledgement of the initial segment arrives, TCP increases the congestion window to 2 and then sends 2 segments, When the 2 acknowledgements of the segments sent out arrives, they each increase the congestion window by one, thereby increasing the congestion window to 4 . therefore it takes log2N round trips before TCP can send N segments
Answer:
The best answer is A) A secure baseline was not established early in the process.
Explanation:
If the organization is deploying to the production environment and the security analyst discovers this risk at this point, then a secure baseline was not established, because it is impossible to successfully pass the coding and peer review instances by programmers and testing instances by the QA team without any warning to correct this problem.