If the four parts sand means 4 cubic meters of sand per 13 cubic meters of concrete, you can you can multiply 4/13 by 6.5 to get 2 cubic meters of sand.
Let me know if I misinterpreted the question so that I can try to fix it. I hope this helps
Answer: <u>brainliesss plsss</u>
The cost of a service call to fix a washing machine can be expressed
Step-by-step explanation:
The cost of a service call to fix a washing machine can be expressed by the linear function y=45x+35 where y represents the total cost and x represents the number of hours it takes to fix the machine.
If 2/3 ton of gravel covers 3/4 of a driveway, you need to divide 2/3 divided by 3 to find how much is needed for 1/4 of the driveway.
Steps:
1. 2/3 divided by 3 = 2/3 * 1/3. So 2/9.
2. Add 2/3 plus 2/9= 8/9 ton of gravel to cover the whole driveway.
Answer: 8/9
Hope this helped, and good luck with any future problems
Answer:
C (-∞, ∞)
Step-by-step explanation:
For graphs like these this will always be the domain as its 'arms' will continue to go further in x values
-4(1)+10=6
-4(2)+10=2
-4(3)+10=-2
-4(4)+10=-6
-4(5)+10=-10
So d is the answer