1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andru [333]
2 years ago
8

Complete the statements based on the dotplots.

Mathematics
2 answers:
lisov135 [29]2 years ago
8 0

Answer:

less than

higher than

Step-by-step explanation:

I got it correct on edg

ikadub [295]2 years ago
5 0

Answer:

less than, higher than

Step-by-step explanation:

You might be interested in
What is the sign of the larger absolute value
Anna11 [10]
> this is the sign for the larger absolute value
8 0
3 years ago
Plzzzz helppppppppp and free kodak
11Alexandr11 [23.1K]

Answer:

77.77

Step-by-step explanation:

you subtract 16 (prediction) - 9 (actual) and divide it by the actual.

7 0
3 years ago
Read 2 more answers
Find the price of one pen if ten pens cost $61.80
Free_Kalibri [48]

Answer:

Step-by-step explanation:

$ 6.18 is what each pen costs

5 0
3 years ago
Read 2 more answers
A croissant shop produces two products: bear claws (B) and almond filled croissants (C). Each bear claw requires 6 oz of flour,
Kruka [31]

Answer:

letter A: B = 400; C = 1000; Max Z = $380

Step-by-step explanation:

bear claws (B) need 6 oz of flour (f), 1 oz of yeast (y), 2 ts of paste (p)

croissants (C) need 3 oz of flour (f), 1 oz of yeast (y), 4 ts of paste (p)

putting that information in equations, we have:

B = 6f + y + 2p

C = 3f + y + 4p

The total number of resources (R) are:

R = 6600f + 1400y + 4800p

Let's call M our total profit, "k1" the number of B produced and "k2" the number of C produced.

So, we can state that:

M = k1*0.2 + k2*0.3

The number of resources R2 will demand is calculated like this:

R2 = k1*B + k2*C = (6k1+3k2)f + (k1+k2)y + (2k1+4k2)p

using R2 and R, we can make some inequations:

6k1+3k2 <= 6600 -> 2k1+k2 <= 2200

k1+k2 <= 1400

2k1+4k2 <= 4800 -> k1+2k2 <= 2400

if we try to maximize k2 (as it worths more), we will have k1 = 0 and k2 = 1200 (limited by p), but looking at the resources R, we will still have resources to use (f and y). Looking at B and C expressions, we see that removing one C gives enough 'p' to make 2 B, which is a good trade (as 2B worths 0.4 cents, and 1C worths 0.3 cents). we have 200 'y' remaining, so doing this 200 times give us k1 = 400 and k2 = 1000, and the only resource remaining will be some of 'f'.

calculating the profit M, we have:

M = 400*0.2 + 1000*0.3 = 380$

the right answer is letter A.

3 0
3 years ago
Sven participates in his employer’s 401k plan. His annual salary is $52,000. Sven contributes 7.5% of his annual salary. His emp
IgorLugansk [536]

Answer:

$ 6,500

Step-by-step explanation:

(52,000)(0.075)+(52,000)(0.05) = 3,900 + 2,600

= 6,500

5 0
2 years ago
Other questions:
  • 15 1/5 divided by 10
    7·2 answers
  • X+3=0 how do I so excited this math equation
    9·2 answers
  • What goes in the blank boxes
    9·1 answer
  • (1) 2x-5=6.6 <br>(2)3/4m+4=13<br>(3)5/2p-3=13<br>(4)3.5m+4.5=11.5<br>(5)9x+3.5=21.5
    7·1 answer
  • Work the following pricing problems for services rendered. (Round to tenths.)
    12·2 answers
  • An elephant drinks 225 liters of water a day. How many liters in 2 days
    9·2 answers
  • Mr. hershman has purchased a farm that is in the shape of a rectangle. the dimensions of the piece of land are 1.3 km by 3.15 km
    5·1 answer
  • Can someone please help me
    14·1 answer
  • Triangle ABC is a right triangle and the measure of angle A is 28 what are the measures of the other two angles
    6·1 answer
  • The graph of a proportional relationship passes through the point (5, 2) . What is the constant of proportionality of the relati
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!