Answer:
Predetermined manufacturing overhead rate= $35.65 per machine hour
Explanation:
Giving the following information:
Estimated the machine-hours= 45,900
The estimated variable manufacturing overhead was $7.53 per machine-hour.
The estimated total fixed manufacturing overhead was $1,290,708.
<u>To calculate the predetermined overhead rate, we need to use the following formula:</u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= (1,290,708/45,900) + 7.53
Predetermined manufacturing overhead rate= $35.65 per machine hour
Available Options Are:
a. Cost of Goods Sold
b. Net Profit Margin
c. None of these
d. Asset Turnover
Answer:
Option B. Net Profit Margin
Explanation:
The increase or decrease in cost of Goods sold can not tell whether the return on assets has increased or decreased becuase it would only tell that the expense are decreased or increased not the profit. Which means it only tells one side of the story hence Option A is incorrect.
Option B is correct because it talks about the profit. If the manufacturing cost has been decreased then the it must increase the profit. Because if the profits has increased then the return on asset will increase. Hence the Option B is correct here.
Option D is incorrect because asset turnover formula is:
Asset Turnover = Sales / Total Assets
The decrease in manufacturing cost will not increase the sales because sales and total assets are independent of manufacturing expenses hence the Option D is incorrect.
Answer:
Kanban inventory system
Explanation:
Kanban inventory system -
It refers to as the system , which make sure than the company's stores only the required components in the production or distribution process , is referred to as kanban inventory system .
The Kanban system enables to give indication for reordering or rearrange the stock .
Hence , from the given information of the question ,
The correct answer is Kanban inventory system .
Answer:
Yes, Tangshan Mining company should accept the project.
Explanation:
Payback period is the number of years it takes for a project's expected cash inflows to recover the initial investment amount.
Tangshan company's required payback period = 3.5 years
<u>Year CF Net CF</u>
0 -5,000,000 -5,000,000
1 1,800,000 -3,200,000
2 1,900,000 -1,300,000
3 700,000 -600,000
4 1,800,000 1,200,000
<em>Payback period = last year with -net CF +(absolute net CF that year /total CF the following year)</em>
Payback period = 3 + (600,000 / 1,800,000)
=3 + 0.33
= 3.33 years
Since 3.33 years is lower than the required payback period of 3.5 years, Tangshan Mining company should ACCEPT the new project; it will take less years to fully recover the initial amount investment.
Answer:
Grouper Inc. is involved in a lawsuit at December 31, 2020
It is given that Grouper will be liable for $863,600 as a result of this suit. Therefore, the journal entry for this situation is as follows;
On December 31, 2020
Lawsuit loss A/c Dr. $863,600
To Lawsuit liability $863,600
(To record the lawsuit loss of the Grouper Inc.)