Answer:
The standard deviation of number of hours worked per week for these workers is 3.91.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X. Subtracting 1 by the pvalue, we This p-value is the probability that the value of the measure is greater than X.
In this problem we have that:
The average number of hours worked per week is 43.4, so
.
Suppose 12% of these workers work more than 48 hours. Based on this percentage, what is the standard deviation of number of hours worked per week for these workers.
This means that the Z score of
has a pvalue of 0.88. This is Z between 1.17 and 1.18. So we use
.





The standard deviation of number of hours worked per week for these workers is 3.91.
Volume of a rectangular prism = l × w × h.
In this case,
V = 270 cubic feet
l = 15 feet
w = 4 ft
h = ?
Plug our values into the volume formula.
270 cubic feet = 15 feet × 4 feet × h.
Simplify the right side
270 = 60 × h.
Divide each side by 60.
4.5 = h
The height is 4.5 feet.
Answer:
Option D
Step-by-step explanation:
The equation to predict the amount saved is

Assuming that the variable x represents the saving months, then substitute
in the quadratic equation and solve for y.

The answer is the option D $5,825
I believe the correct answer from the choices listed above is option A. Given a segment with endpoints A and B and the steps given above, the figure that you can construct would be a perpendicular bisector. <span>The </span>perpendicular bisector<span> of a line segment can be constructed using a compass by drawing circles centered at and with radius and connecting their two intersections.</span>