Answer:
y=60+25h+0.3r
Step-by-step explanation:
let y be the total charges
given that the hour is h
and the cost for raw material is r
therefore
1. The first hour of service call = $60
2. For each additional hour= 25h
3. 30% over the cost of the materials.= 30/100*r=0.3r
total charges
y=60+25h+0.3r
therefore the expression is
y=60+25h+0.3r
Answer:
A
Step-by-step explanation:
Its A the other ones don't make sense
1) we have to calculate the lenght of the baseball field.
perimeter of the baseball field=2(radius)+lenght of a semicircle.
2(radius)=2(175 ft)=350 ft
lenght of a semicircle=40% of a circumference=(40/100)(2πr)
Perimeter of the baseball field=2(175 ft) + (40/100)(2π175 ft)=
=350 ft + 140π ft=350 ft + 439.82 ft=789.82 ft,
2)Now, we calculate the amounts of time that it takes you to ruan arount the baseball field.
10 ft------------------------1 second
789,82 ft----------------- x
x=(789.82 ft * 1 second) / 10 ft=78.98 s≈79 s
answer: 79 seconds.
Answer:
y = (-2/3)x - 1/3
Step-by-step explanation:
Find the equation of the line through the two points (-2, 1) and (1, -1).
As we increase x from -2 to 1 (an increase of 3), y decreases from 1 to -1 (a decrease of 2).
Thus, the slope of this line is m = rise / run = -2/3.
Using the slope-intercept formula y = mx + b, and substituting the givens m = -2/3, x = -2 and y = 1, we get:
1 = (-2/3)(-2) + b, or
1 = 4/3 + b, or 3/3 = 4/3 + b.
Then b must be 3/3 - 4/3, or -1/3, and the equation of the line is then
y = (-2/3)x - 1/3
Answer:
You need to record interest earned :)
Step-by-step explanation:
Hope it helps :)