Answer:
The second graph, as x approaches positive 2 is correct.
Explanation:
Create a table to find the points and graph to find the curve.
x. -2 1 0 1 -2
y. 11 5 3 2.3 2.1
Answer:
z - 2*x - 1.5*y = 0 maximize
subject to:
3*x + 5*y ≤ 800
8*x + 3*y ≤ 1200
x, y > 0
Step-by-step explanation:
Formulation:
Kane Manufacturing produce x units of model A (fireplace grates)
and y units of model B
quantity Iron cast lbs labor (min) Profit $
Model A x 3 8 2
Model B y 5 3 1.50
We have 800 lbs of iron cast and 1200 min of labor available
We need to find out how many units x and units y per day to maximiza profit
First constraint Iron cast lbs 800 lbs
3*x + 5*y ≤ 800 3*x + 5*y + s₁ = 800
Second constraint labor 1200 min available
8*x + 3*y ≤ 1200 8*x + 3*y + s₂ = 1200
Objective function
z = 2*x + 1.5*y to maximize z - 2*x - 1.5*y = 0
x > 0 y > 0
The first table is ( to apply simplex method )
z x y s₁ s₂ Cte
1 -2 -1.5 0 0 0
0 3 5 1 0 800
0 8 3 0 1 1200
chile anyways so i just wanted the points
Do a proportion
78/100= x/95
Cross multiply and divide
78 x 95= 7,410
7,410 divided by 100 is 74.1
Answer is 74.1