Answer:
Solvency
Explanation:
Solvency is defined as the ability of a company to meet it's long term financial obligations like having the ability to pay off debts as they mature. Solvency measures if a company is able to pay off it's debt in long term.
Although solvency and liquidity are similar, difference is liquidity is more concerned with paying off short term debts.
A company or firm is said to be solvent when the current assets exceeds current liabilities.
Answer with Explanation:
The decision making under the conditions of uncertainty:
Uncertainty is an unquantifiable outcome of a decision that can not be mathematically modeled whereas risk is a quantifiable outcome of a decision that can be mathematically modeled.
The expected value method helps in decision making related to uncertainty are making prudent estimates of cash flow by using expected value.
Expected value considers every outcome under uncertainty and computes all of the expected value for each outcome. The outcome that gives highest expected value is said to be best case and likewise the outcome that gives lowest expected value is said to be worst case.
Suppose that two projects gives the same expected value, then the decision will be based on the degree of uncertainty which means the project that has lowest uncertainty of returns will be our choice.
The deviation of the expected value from required return on a project can be measured as a Degree of uncertainty that helps in understanding to what extent the return will be not as per the expectation. The Precise Measurement of uncertainty can be calculated by inclusion of standard deviation to estimate expected value of the decision taken.
The expected money value is the monetary value that a particular decision will generate. In expected monetary value the decision is based on the weighted average of best case and worst case. The value derived is average thus the standard deviation would be very low which means that the calculation was precise. Decision trees are used in precise measurement of cash flow related to each expected outcome and deriving a weighted average value.
According the utilitarian approach actions and plans should be taken<span> in a way that will produce the greatest benefit to society and produce the least harm at lowest cost and</span> judged by their consequences. The utilitarian approach proposes that actions and plans should be judged by their consequences. research reveals that stakeholders who have the ability to affect the company have the most power; whereas stakeholders that have legitimacy have a legal or moral claim on company resources.
Answer:
PV of the stock today = $115.83
Explanation:
We will use the discounted cash flows approach to calculate the price of the stock today. This approach values the stock by accumulating the present value of all the expected future cash flows from the stock/asset.
As the preferred stock pays a constant dividend after equal intervals of time and for an indefinite period, it can also be treated as a perpetuity. Thus, the formula for the present value of perpetuity will be used to calculate the price of the stock at year 10 that we will discount back to today.
Present value of perpetuity = Cash flow / expected rate of return
PV of stock at Year 10 = 10 / 0.052
PV of stock at Year 10 = 192.3076923
The value of the today will be,
PV of the stock today = 192.3076923 / (1+0.052)^10
PV of the stock today = $115.83
Answer:
1. a. Only major materials and components.
Only the major materials and components are include as direct materials because these are the materials that directly needed for production.
b. Only hourly production workers (aka assembly workers).
The direct labor has to be those people who are directly involved in production which in this case is the assembly workers. Managers and Supervisors are not integral so are not direct labor.
c. Both big items that cannot be traced (e.g., factory rent) and small items that are not worth tracing (e.g., glue, grease).
All other items involved in production should be included as manufacturing overheads including big items and small items that cannot be traced.
2.
Rent for the factory building ⇒ <u>Manufacturing Overhead (OH).</u>
Cost of engines used in production ⇒ <u>Direct materials (DM).</u>
Depreciation on production equipment ⇒ <u>Manufacturing Overhead (OH). </u>
Cost of lubricant used in production. ⇒<u> Manufacturing Overhead (OH). </u>
Production supervisor's salary. ⇒ <u>Manufacturing Overhead (OH). </u>
Assembly workers' wages. ⇒ <u>Direct Labor.</u>