1. It pollutes the land and water.
2. It takes a long time to break down.
3. It conducts head and electricity.
Answer:
Examples relating to project management are if machine malfunctions, computer crashes, there is a power cut, etc. These kinds of random things that can happen during a project are examples of special cause variation. One way to evaluate a project’s health is to track the difference between the original project plan and what is happening.
General Winfield Scott
By 1838, only about 2,000 Cherokees had left their Georgia homeland for Indian Territory. President Martin Van Buren sent General Winfield Scott and 7,000 soldiers to expedite the removal process. Scott and his troops forced the Cherokee into stockades at bayonet point while whites looted their homes and belongings.
Answer: A group of citizen soldiers that arm themselves is called a militia
Please give me brainliest if im right