Let x be the weeks worked on building the road
13=(1/2)x
13*2=x
26 days=x
In the duration of 26 weeks, the road should be built.
Hope I helped :)
See the attached picture to better understand the problem
we know that
in the right triangle ABC
sin 63°=AB/BC
AB is the opposite side angle 63-----> x cm
BC is the hypotenuse-----> 85 cm
AB=BC*sin 63°-----> AB=85*sin 63-----> AB=75.736 cm
AB=75.8 cm
the answer isthe value of x is 75.8 cm
Roger: $24
Bethan: $36
Explanation:
4/5 of $75 is $60
So $60 is distributed to Roger and Bethan in the ratio 2 : 3.
Add the numbers in the ratio 2 : 3
2 + 3 = 5
Divide $60 by 5
60 ÷ 5 = 12
Multiply each number in the ratio 2 : 3 by 12:
2 • 12 : 3 • 12
= 24 : 36
I’m sorry if I explained this badly
But if my answer was correct, brainliest please!
Have a nice day!
-SpaceMarsh :D
so we have 3 folks painting 4 walls, now each one of them works for 32 minutes
person 1............. 32 mins
person 2............. 32 mins
person 3............. 32 mins
for a total of 32+32+32 = <u>96 minutes worth of work</u>. That's for 4 walls, how many minutes worth is just 1 wall?
96 ÷ 4 = 24 mins.
so to paint a wall, it takes 24 mins of work worth.
so then, to paint 7 walls, that'd be 7 * 24 = 168 minutes worth of work.
what about for 4 folks doing it? How many times does 4 go into 168? 168 ÷ 4 = 42 mins.
Answer:
The two groups of people Ismael faces danger from were the group of muscular men with machetes and crowded village where they stopped on their way.