Answer:
D) substantial, but not complete, performance
Explanation:
Even though Moses breached his contract with Noelle, most part of the contract was performed. The most significant part of the contract was the apartment itself, not the air conditioning system. For a material breach to exist Moses should have failed to perform in a greater way, not just the air conditioning. Probably Noelle should get a discount on the price of the apartment so that she can get the air conditioning system installed.
The fact that Noelle stopped paying for the apartment just because of this is a little overreacting. For example, if I buy a used car and the previous owner forgets to give me the spare tire, I cannot stop paying because it may be worth money but proportionally it's a small amount.
Answer:
C)
Explanation:
Based on the information provided within the question in this case Rochelle does not have a claim for sexual harassment because her claim would be based on one isolated incident that is not serious enough to warrant undue concern. This is the case since Henry has not made a single advancement towards Rochelle since she declined his date.
Answer:
correct option is d. two-thirds
Explanation:
given data
accumulated = $12.5 trillion
net worth = 14 percent
solution
here as per statistical data of 4th quarter in year 2015,
that required holding is two third of having home.
and Accumulated equity indicate the demand for housing in the country
so here 1 -
=
rd left out
it is assumed that they should get home at the beginning of 2015 (in the 1st quarter)
so correct option is d. two-thirds
Your answer would be B. The price will go up because supply is low.
Answer:
<em>(A) Unit variable costs fluctuate and unit fixed costs remain constant.</em>
Explanation:
The <em>fixed costs</em> are the costs which have to be incurred always, irrespective of what the output produced is by the firm. For instance, a firm always has to charge depreciation on its fixed assets, pay salary to the premises staff and pay fixed salary to the managers for managing etc, irrespective of whatever output it produces.
<em>Variable costs</em> are the costs which vary with the level of output produced activity. For example, if more output is produced more will be the raw material payments, more will be the manufacturing related other expenses and more will be the wages paid to the labour etc and vice-versa.
Hence, thereby the per <em>unit variable costs fluctuate and unit fixed costs remain constant.</em>