<span><span><span>15+<span>3t</span></span>−5</span>−<span>8t</span></span><span>=<span><span><span><span><span>15+<span>3t</span></span>+</span>−5</span>+</span>−<span>8t</span></span></span>Combine Like Terms:<span>=<span><span><span>15+<span>3t</span></span>+<span>−5</span></span>+<span>−<span>8t</span></span></span></span><span>=<span><span>(<span><span>3t</span>+<span>−<span>8t</span></span></span>)</span>+<span>(<span>15+<span>−5</span></span>)</span></span></span><span>=<span><span>−<span>5t</span></span>+10</span></span>Answer:<span>=<span><span>−<span>5t</span></span>+<span>10</span></span></span>
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
<span>Cube root of 0.000064 = 0.04
hope it helps
------------------</span>
I think the interest is 10.60.
And the proceeds are 278.40.