Answer: True
Explanation:
Yes, the given statement is true that the due to the very low feasibility the IT (Information technology) department are not aware of the hidden backlog that basically contain projects.
The feasibility is the main factor in the IT department as it helps to study whole objective of the project and then also uncover all the strength and weakness of the project so that we can easily go through the details to make the project more efficient and reliable.
Answer:
17.0
Explanation:
after first loop numA = 0.0 + 2 = 2.0
after second loop numA = 2.0 + 5 = 7.0
after third loop numA = 7 + 10 = 17.0
Show us a picture so we can answer
The answer is : the run() method defined in BMW will be called.
run() BMW