Answer:
Probability = 0.00621
Step-by-step explanation:
We are given;
Population mean; μ = 400
Population standard deviation; σ = 20
Raw score; x¯ = 450
the probability that the actual costs will exceed the budgeted amount will be the p-value.
Thus, let's first find the z-score after which we will find the p-value.
z = (x¯ - μ)/σ
z = (450 - 400)/20
z = 50/20
z = 2.5
From online p-value from z-score calculator attached, using z = 2.5; one tailed hypothesis; significance level of 0.05, we have;
P-value = 0.00621
Answer:
62
Step-by-step explanation:
3 x 5 = 15
3 x 2 = 6
2 x 5 = 10
15 x 2 = 30
6 x 2 = 12
10 x 2 = 20
30 + 12 + 20 = 62
Answer:
-3/4
Explanation:
-21 and 28 are both multiples of 7. Divide the numerator and denominator by 7 to simplify it.
-21/28
= -3/4
I hope this helps!
Answer:
C
Step-by-step explanation:
y=x is a line that has slope 1 meaning it go ups (increases) from left to right.
So that puts us at choice A or C.
Both A or C differ by the numerator for the other function.
We can find the x-intercept for A and C by setting the numerator equal to 0 and solving for x.
Let's do that:
A: -x-10=0 C. -x+10=0
-x=10 -x=-10
x=-10 x=10
A says x-intercept -10
C says x-intercept 10
Your graph intercepts the x-axis at 10 so the answer is C.