Answer:
The answer is $209,300
Explanation:
This is an indirect method of preparing cash flow. Why? - Because indirect method of preparing cash flow start with net income under cash flow for operating activities section.
Account payable decrease over the year($36,600 - $32,100)
=$4,500
Inventory balance increase over the year($46,300 - $43,100)
=$3,200
Therefore, Nevada Boot would report operating cash flows of:
Net income....................................$217,000
Less:
Increase in inventory......... ($3,200)
Decrease in accounts payable.................................. ($4,500)
Cash flow from operating activities...............................$209,300
Answer:
Estimated manufacturing overhead rate= $77 per direct labor hour
Explanation:
Giving the following information:
Production:
Product A: 1,850 units
Product B: 1,250
Hours required:
Product A: requires 0.3 direct labor-hours per unit
Product B: requires 0.6 direct labor-hours per unit.
The total estimated overhead for the next period is $100,485.
First, we need to calculate the total amount of direct labor hours required:
Total direct labor hours= 0.3*1,850 + 0.6*1,250= 1,305 hour
To calculate the estimated manufacturing overhead rate we need to use the following formula:
Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Estimated manufacturing overhead rate= 100,485/1,305= $77 per direct labor hour
Answer and Explanation:
The preparation of the analysis is shown below:
Particulars Retained equipment Replace equipment Net income change
Variable cost $1,560,000 $1,230,000 $330,000
($520,000 × 3 years) ($410,000 × 3 years)
New machine cost $300,000 -$300,000
Net change $30,000
So based on the analysis the old machine should be replaced
Therefore we considered all the information given in the question
Answer:
Marissa only needs to attend a two-year college.
Explanation:
A hydroelectric production manager requires both technical and managerial skills. Like many other managerial positions, this one too requires a minimum of a bachelor's degree. Marissa will have to attend a four-year degree program at a college/university.
After graduation and once employed, Marissa will need guidance and work experience to grow to her dream position. She will require an apprenticeship program to prepare her for the managerial role. The counselor also made an error by telling her that she needs four years of college education to acquire an associate degree. The truth is that an associate degree takes two years to achieve.
Troubleshooting means finding and fixing a problem ,hope this helps