Step-by-step explanation:
1/5=1/5×1000=200
1/2 of 200
1/2×200=100
Answer:
the cost function is Cost=7000 m*$ /R + 50.265 $/m² * R²
Step-by-step explanation:
then the cost function is
Cost= cost of side area+ cost of top + cost of bottom = 2*π*R*L * 5$/m² +
π*R² * 8$/m² + π*R² * 8$/m²
since the volume V is
V=π*R²*L → V/(π*R²)=L
then
Cost=2*π*R*V/(π*R²) * 5$/m² + π*R² * 8$/m² + π*R² * 8$/m²
replacing values
Cost=2*700 m³ /R * 5$/m² + π*R² * 16$/m² = 7000 m*$ /R + 50.265 $/m² * R²
thus the cost function is
Cost=7000 m*$ /R + 50.265 $/m² * R²
<span>Faster maid DATA:
time = x hr/job ; rate = 1/x job/jhr
Slower maid DATA:
time = 3x hr/job ; rate = 1/3x job/hr
Together DATA:
time = 3 hr/job ; rate = 1/3 job/hr
Equation:
rate + rate = together rate
1/x + 1/3x = 1/3
Multiply thru by 3x to get:
3 + 1 = x
x = 4 hrs (time for the faster maid to do the job)</span>
Start the number line from 0 and put divisions at 1/12. Then mark at 4/12 for plant A and indicate this was its growth in the first week. Then, make another mark up to 6/12 and indicate this was the plant's growth in the second week.
For plant B, make one mark at 7/12 and indicate that this is plant B's growth in the first week.
After two weeks, plant A has a height of 6/12 inches and plant B has a height of 7/12 inches, so B is taller.