Answer:
True
Explanation:
Most of the organization suffers from InfoObesity, i.e., too much data without the proper holding structure for this.
Business intelligence abbreviated as BI plays a major role in the determining the planning strategies of an organizations and serves multiple purposes which includes measurement of performance towards business objectives, quantitative analysis, data reporting and sharing, etc.
BI systems helps in eliminating InfoObesity, by manging the data and filtration of the data with proper data structure to serve specific purposes.
Answer:
Sensitivity analysis is the method in which it basically predict the final outcome of the decision. It analysis each variable individually and identify the dependency of the output value on the particular value of the input.
The advantage of the sensitivity analysis is that it reduce the overall risk of the particular strategy and also impact of the system.
It basically work on the basic principle that firstly changed the structure and model and then observe the particular behavior of the model.
Answer:
A high availability hub is not required to enable or use the self-describing agent. You can optionally configure a high availability hub for improved availability and recovery if the hub fails. Network Layer – The network layer is responsible for creating a routing table, and based on the routing table, forwarding the input request. Some of the Devices used in the Network Layer are, Routers: A router is a switch-like device that routes/forwards data packets based on their IP addresses.
Explanation:
(hope this helps can i plz have brainlist :D hehe)
It would take 2 consultants 30 hours to create a slide deck of 120 slides.
Explanation:
Rate of slide making by one consultant- 2 slides per hour
Target- 120 slides
2 consultants are employed in the job-
Since 2 consultants are employed in the job, total rate of making slides per hour would be 4 slides/hour (2*2 slides/hour)
Time required to complete 120 slides= total slides/rate of doing slides per hour
Substituting the values, we get
Time required= 120/4= 30 hours
Hence, it would take 30 hours for 2 consultants to create a slide deck of 120 slides.