The Elliot’s have budgeted $2000 to install new wood floors in their home. The materials cost them $1055. If the installer charg
es $35 per hour to install the floor how many hours can the installer work to stay within the Elliot’s budget?
2 answers:
Its 27 hours because the installer can work before elliot
Answer:
27 hours
Step-by-step explanation:
2,000-1,055=945
945/35=27
27 hours is the most the installer can work before going over Elliot's budget hope this helps :D
You might be interested in
Answer:
for the second space add a zero then multiply 5x5 and 5x2 add that and move the decimal 2 places to the left its infront of your addition answer.
Step-by-step explanation:
Rewrite the decimal number as a fraction with 1 in the denominator
0.225=0.22510.225=0.2251
Multiplying by 1 to eliminate 3 decimal places, we multiply top and bottom by 103 = 1000
0.2251×10001000=2251000
There is no picture given but I’m assuming you need to simplify it. The answer is 9x + 12
MN = ML because both angles are 50 degrees
X + 3 = 4X
3X = 3
X = 1
C is the answer
First subtract the amount the bow takes from the total:
70 - 32 = 38 inches
The width is 14 on top and bottom so subtract 14 x 2 = 28 from 38:
38-28 = 10
Divide 10 by the 2 sides:
10/2 = 5
The height is 5 inches.