Answer:
thumb should be used to press space bar.
LA califora 5421 beach street 2357 LA city
Answer:
b. false
Explanation:
A bottleneck is a point at which there is the stoppage in the system of production. The inefficiencies that are generated through the bottleneck developed the delays and leads to the high cost of production
Here in the given situation, since there is the highest contribution margin per unit that gives more priority as compared with the contribution margin per bottleneck hour i.e. totally wrong as it should give the priority to the contribution margin per bottleneck hour
Therefore the given statement is false
Answer:
If the effective tax rate increases then the net savings coming from investments will get lowered as a result the investment will have higher payback period (The increase in effective tax rate would lower demand of the product which means there is decline in net saving arising from the sale of the product). Likewise this decrease in annual net savings will also decrease the internal rate of return which shows that their are increased chances of project rejections. The NPV method is based on cash flows and relevant costing just like IRR and payback method but the only difference is that it assumes that the cash earned would be reinvested at cost of capital. The NPV will also decrease due to increased effective tax rate.