I can only give possible combination of the ages. Had the sum of the ages been given, then the 3 specific numbers would have been derived.
We need to do prime factorization of 72.
72 ÷ 2 = 36
36 ÷ 2= 18
18 ÷ 2 = 9
9 ÷ 3 = 3
3 ÷ 1 = 1
1 x 2 x 2 x 2 x 3 x 3 = 72
Possible combinations:
1 x 8 x 9 = 72 1 + 8 + 9 = 18
1 x 4 x 18 = 72 1 + 4 + 18 = 23
2 x 4 x 9 = 72 2 + 4 + 9 = 15
3 x 4 x 6 = 72 3 + 4 + 6 = 13
Answer:
<em>The answer resides in the explanation.</em>
<em>Pls rate as brainliest </em>
Step-by-step explanation:
The predicted useful life of a brand A cutting tool when the speed is 45 meters per minute is 1.2 to 5.5 hours.
The predicted useful life of a brand B cutting tool when the speed is 45 meters per minute is 3.4 to 5.4 hours.
The prediction interval for brand A is larger than the prediction interval for brand B because the estimated standard error of y^ is different for the two intervals.
The prediction intervals are both larger than the corresponding confidence intervals.
The standard error for the estimated mean value of y is smaller than the standard error for the predicted value of y.
The predicted useful life of a brand A cutting tool that is operated at 100 meters per minute is -0.59 hours
The actual predicted useful life of a brand A cutting tool when the speed is 100 meters per minute is 0.0 to 2.3 hours.