Answer:
x=26°
Step-by-step explanation:
3x-14+x+90=180
4x-14=90
4x=104
x=104/4
x=26°
Answer:
The equation of this line is therefore y = 2x + 3.
Step-by-step explanation:
this line passes thru the points (0, 3) and (3, 9). As we move from (0, 3) to (3, 9), x increases by 3 and y increases by 6. Thus, the slope of this line is
m = rise / run = 6/3, or m = 2. Inserting the known info (m = 2, x = 0, y = 3) into y = mx + b, we get: 3 = 2(0) + b, so we see that b = 3.
The equation of this line is therefore y = 2x + 3.
You work 50 -40 = 10 extra hours per week but get paid for 1.5 times that, or 15 extra hours. In all, you're paid for 40 +15 = 55 hours per week.
.. (55 h/wk)*(4 wk/mo)*($16/h) = $3520/mo
Your gross pay for the month (4 weeks) will be $3,520.
Step-by-step explanation:
1 km = 1000 m
(hence the term "kilo" which means 1000).
so. he runs 1000 m at the rate of 3 minutes per km, that means 3 minutes per 1000 m.
now, we can see the solution already with our eyes.
but let's do it formally :
the rate or ratio between time and distance must be the same for the same speed.
so,
3 min / 1000 m = x min / 500 m
500 m × 3 min / 1000 m = x min
1/2 × 3 min = x min
3/2 = 1.5 min = x min
so, it takes him 1.5 minutes (90 seconds) to run 500 m.