During the project life cycle before final completion, there are various stages involved, and each of these stages are packed with their challenges that may sometimes cause the failure of the project completion, either causing delays, or sometimes outright abandonment of the project.
Hence, the needs the look for the potential signs if a current project is experiencing issues, so as to solve them, and eliminate the issues immediately.
Some of the signs to be identified if a current projects is experiencing issues are:
1. The mapped out project duration is not being followed or overlapped
2. The actual or running cost of project execution is going beyond the budgeted cost of the project in each stage of the project.
3. The vital cog personnels to the project are leaving before their expected exits.
4. Decision makers are found wanting, during project meetings and critical path decision periods.
5. The vital parts of the projects are getting delayed in execution.
6. Low or under funding of the project.
Answer:
The answer is C- Pesticide tolerant individuals who survive and reproduce, which makes the pesticide less effective for future pest generations.
Explanation:
Pesticide resistance is the genetically based, statistically significant ability of a pest to avoid toxic effects when exposed to a particular pesticide. It also describes the decreased susceptibility of a pest population to a pesticide that was previously effective at controlling a pest. They are able to reproduce offspring that are also able to resist the pesticide.