If the entire ray is PQ, then all of those points lie on the ray.
Answer:
37.5%
Step-by-step explanation:
Answer:

Step-by-step explanation:

It takes 1.5 hours for 4 workers to paint the same room
<em><u>Solution:</u></em>
Given that 3 workers can paint a room in 2 hours
To find: Time taken for 4 workers to paint the same room
Assume the time needed to paint the room is inversely proportional to the number of worker

Where, "k" is the constant of proportionality
<em><u>3 workers can paint a room in 2 hours</u></em>
Substitute number of workers = 3 and time = 2 hours

Therefore,

To find time taken for 4 workers to paint the same room, substitute number of workers = 4 in above expression

Thus it takes 1.5 hours for 4 workers to paint the same room
4. Using the given formula, replace t with 8 seconds and multiply:
343 x 8 = 2,744 meters.
5. Domain is the X value, replace x with 1/4 and solve:
1/4^2 + 2 = 2 1/8
y= 2 1/8