She earns ($9.70x40) for a 40 hour week=$388
She earned $489.85-$388 extra= $101.85
She gets paid $9.7x1.5 for every extra hour=$14.55
She worked $101.85/$14.55 hours extra=7hours
She worked 7+40 hours that week=47 hours
Multiplying both sides of the equation by 3 and substituting 4 for p
Answer:
4.5
Step-by-step explanation:
7.3= y + 2.8
Subtract 2.8 from both sides
7.3 = y+ 2.8
-2.8 -2.8
--------------------
y = 4.5
Answer:
14
Step-by-step explanation:
x=4 y=1
Substitute them into the equation 3x-4yy+6
3(4)-4(1)+6
12-4+6
From one vertex of an octagon you can draw 5 diagonals.
There are 8 vertices in an octagon, and we are choosing one as our starting vertex. There are then 7 vertices left to draw a line to, but 2 of the vertices are already connected to our main vertex (because they are connected along the side of the octagon). That leaves 5 vertices to draw a diagonal to from our original vertex.