
===========================================
<u>Solution - Answer (a): The current maximum output would depend on slowest operations and that is B. Optometrist conducting eye exam (25min per patient) Hence total time available for task(B)= 10 hours * 60 min - (2 minute for first patient to greet + frame selection 20 min + glasses made 60 min + final fitting 5 min) = 600 -87 = 513 minutes. Hence, maximum capacity = 513/25 = 20.52 ~ 20 patients Answer (b): Since, the slowest process is B. Optometrist conducting eye test, if a person were to be added it must be there. The added capacity at no other place would increase total capacity of the patients processed in a day. Answer (c): In the mentioned model, the process of D and E, totaling to 65 minutes would be eliminated. And hence, in day...</u>
<u>tsurezure children</u>
<u>#BrainliestBunch</u><u> </u>
Answer
oatmeal, apples, peas, carrots, beans and pears
Explanation:
um I suggest call the ambulance and parents right away...
Answer:
<em>bronch</em><em>/</em><em>o</em><em>/</em><em>cele</em><em> </em>
Explanation:
im not sure