<h3>
Answer: C) 4</h3>
All points on the blue curve f(x) are shifted up 4 units to get corresponding points on the red curve g(x). For example, the point (0,-3) moves up 4 units to (0,1).
g(x) = f(x)+k
g(x) = f(x)+4
Answer:
Standard error = 0.4
Step-by-step explanation:
Step 1
We find the Standard Deviation
The formula = √(x - mean)/n - 1
n = 15
Mean = 1.93 hours
= √(0- 1.93)² + (0-1.93)² +(0- 1.93)²+( 0- 1.93)²+ (1- 1.93)² + (1- 1.93)² +(1 - 1.93)² +(2 - 1.93)² + (2 - 1.93)² + (2 - 1.93)² + (2 - 1.93)² + ( 2 - 1.93)² +(4 - 1.93)² +(4 - 1.93)² + (5 - 1.93)²/15 - 1
= √(3.737777776 + 3.737777776 + 3.737777776 + 0.871111111 +0.871111111 + 0.871111111 + 0.004444444445+ 0.004444444445 + 0.004444444445 + 0.004444444445 + 0.004444444445 + 1.137777778 + 4.271111112 + 4.271111112 + 9.404444446)/15 - 1
= √2.352380952
= 1.533747356
Step 2
We find the standard error
The formula = Standard Deviation/√n
Standard deviation = 1.533747356
n = 15
= 1.533747356/√15
= 1.533747356 /3.87298334621
= 0.39601186447
Approximately = 0.4
Therefore, the standard error is 0.4
Answer:
A prime number is any number that cant be divide by any number but 1 (Ex. 1 2 3 5; Non-Ex. 4 6 8)
If you assume doubling the workers will halve the time taken to finish then 12 analysts will take 21 days
To finish in 7 days (1/6 of 42 days) you would need 6 x the original number = 36 analysts.
Brook’s Law (see Wikipedia) suggests than adding extra analysts will actually slow the project down!
One reason is the extra people tend to get in each others way.
Answer:The first table would be a proportional relationship.
Step-by-step explanation:
It's the only table with a constant, which is required in a proportional relationship. The constant would be 1300 which you can find by divided the two numbers in each row.