loris [4]
3 years ago
12

Schell Company manufactures automobile floor mats. It currently has two product lines, the Standard and the Deluxe. Schell has a

total of $39,060 in overhead. It currently uses a traditional cost system with overhead applied to the product on the basis of either labor hours or machine hours. Schell has compiled the following information about possible cost drivers and its two product lines: Schell Company Total Quantity/Amount Consumed by Standard Floor Mat Line Quantity/Amount Consumed by Deluxe Floor Mat Line 600 labor hours 400 labor hours 200 labor hours 7,150 machine hours 4,150 machine hours 3,000 machine hours Required: 1. Suppose Schell uses a traditional costing system with direct labor hours as the cost driver. Determine the amount of overhead assigned to each product line. 2. Suppose Schell uses a traditional costing system with machine hours as the cost driver. Determine the amount of overhead
Business
1 answer:
kenny6666 [7]3 years ago
7 0

Answer:

Instructions are below.

Explanation:

Giving the following information:

Schell has a total of $39,060 in overhead.

Direct labor hours:

Standard= 400

Deluxe= 200

Machine hours:

Standard= 4,150

Deluxe= 3,000

To calculate the estimated manufacturing overhead rate we need to use the following formula:

Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

1) Direct labor hours as allocation rate

Estimated manufacturing overhead rate= 39,060/600= $65.1 per direct labor hour

Now, we can allocate to each product line:

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Standard= 65.1*400= $26,040

Deluxe= 65.1*200= $13,020

2) Machine hour as allocation rate:

Estimated manufacturing overhead rate= 39,060/7,150= $5.46 per machine hour

Now, we can allocate to each product line:

Standard= 5.46* 4,150= $22,659

Deluxe= 5.46*3,000= $16,380

You might be interested in
The management of Firebolt Industries Inc. manufactures gasolineand diesel engines through two production departments, Fabricati
GalinKa [24]

Solution:

Single factory overhead amount: the amount at which plant overheads or processing overheads are assigned to goods is referred to as single plant overhead rate.

Formula to measure a single plant-wide overhead rate:

Single plant-wide overhead rate :

\frac{Total budgeted factory overhead}{ Total budgeted plant-wide allocation base}  

Different development team overhead rate: this distribution system describes the various divisions engaged in the manufacturing cycle. Factory overheads are assigned to goods on the basis of the overhead cost for each of the manufacturing units.

Formula for calculating various output department overhead:

Multiple production department overhead rate:

\frac{ Budgeted department factory overhead}{ Budgeted department factory overhead}

For calculate: single plant-wide overhead rate use direct working hours (DLH) as the allocation basis, and measure factory overhead.

Using DLH as the allocation basis to measure a single plant-wide overhead limit.

Single plant-wide overhead rate :  \frac{Total budgeted factory overhead}{ Total budgeted plant-wide allocation base}

                                                     = \frac{80,000}{10,000 DLH}

For calculate: single plant-wide overhead rate use direct working hours (DLH) as the allocation basis, and measure factory overhead.

Using DLH as the allocation basis to measure a single plant-wide overhead limit.

4 0
3 years ago
Suppose you are evaluating two mutually exclusive projects, A and B. Project A costs $350 and has cash flows of $250 and $250 in
ki77a [65]

Answer:

The answer is 30%

Explanation:

Solution

Given that:

Project A

Project A costs = $350

Cash flows =$250 and $250 (next 2 years)

Project B

Project B costs =$300

Cash flow = $300 and  $100

Now what is the crossover rate for these projects.

Thus

Year Project A    Project B A-B        B-A

0            -350     -300        -50        50

1             250      300        -50        50

2             250      100         150       -150

IRR         27%      26%         30%      30%

So,

CF = CF1/(1+r)^1 + CF2/(1+r)^2

$-50 = $-50/(1+r)^1 + $150/(1+r)^2

r = 30%

CF = CF1/(1+r)^1 + CF2/(1+r)^2

$50 = $50/(1+r)^1 + $-150/(1+r)^2

r = 30%

Hence, the cross over rate for these project is 30%

Note:

IRR =Internal rate of return

CF =Cash flow

r = rate

5 0
3 years ago
Investment A produced annual rates of return of 4%, 8%, 14% and 6% respectively over the past four years. Investment B produced
Ghella [55]

Answer:

A

Explanation:

The investment A was more risky, but in general they were both pretty much a risk.

With both having a produced annual rates of return in under 10%

Reason for A being the riskier is that his annual rate of return in average was 8%, while B's annual rate was 9%

Difference may seem small, but for bigger investments 1% can be a deal breaker.

8 0
3 years ago
There is nothing that can be done when advertisers record and transmit their advertisement at higher volume than the
Naddik [55]

Answer:

This is false. The TV network is able to limit how often commercials and advertisements are played on their network channel.

7 0
1 year ago
John, a line supervisor, has decided to increase Kerry's responsibilities by delegating more work to her station. what is the fi
melomori [17]
<h2>Clarify the assignment would be the first step john should take to increase Kerry's responsibilities.</h2>

Explanation:

Option A: If a new work is assigned or an additional work is assigned, it is necessary to first explain about the new responsibility and clarify about the assignment. This would ensure Kerry to continue the work smoothly.

Option B: Feedback is always welcome but this is not the first step to add responsibilities.

Option C: Notifying others is the responsibility of John and not Kerry. So this choice is invalid.

Option D: Accountability though it is mandatory comes only in the closure part.

7 0
3 years ago
Other questions:
  • The labor force includes rev: 05_30_2018 Multiple Choice employed workers but excludes persons who are officially unemployed. pe
    11·1 answer
  • In the context of statutorily mandated arbitration, why has arbitration become widespread during the last few decades?
    13·1 answer
  • Automation of a process activity consists of moving work from the ________ of the symmetrical five-component framework.
    12·1 answer
  • The Unadjusted Trial Balance columns of a work sheet total $97,500. The Adjustments columns contain entries for the following:
    8·1 answer
  • If a sample of items is taken and the mean of the sample is outside the control limits, the process is: in control, but not capa
    11·1 answer
  • Use the following information for Exercises 8-9 below. (Static)[The following information applies to the questions displayed bel
    7·1 answer
  • Consider a small landscaping company run by Mr. Viemeister. He is considering increasing his firm’s capacity. If he adds one mor
    8·1 answer
  • 2. Matthew bakes apple pies that he sells at the local farmer’s market. If the price of apples increases, the a. supply curve fo
    7·1 answer
  • A government acquires as an investment a 30-year U.S. Treasury bond having a face value of $10,000. At the end of year 20, with
    9·1 answer
  • Selling goods only at certain predetermined prices that reflect definite price breaks is called .
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!