Answer:
Step-by-step explanation:
Answer:
It's linear
Step-by-step explanation:
Answer:
13750
Step-by-step explanation:
Let 'x' be the number of bulbs produced in second shift
Number of bulbs produced in 1st shift= 5.5x
Total number of bulbs= 5.5x+x
16250=5.5x+x
x=2500
Number of bulbs produced in shift 1= 5.5×2500
= 13750
Answer:
Results are below.
Step-by-step explanation:
<u>First, we need to calculate the variable income per job:</u>
<u />
First job= 450 - 150= 300
Second job= 675 - 150= 525
<u>Now, the hourly rate:</u>
<u></u>
Hourly rate= total variable income / number of hours
First job= 300 / 4= $75
Second job= 525 / 3= $175
It is probably that the second job was 7 hours long. If not, he doesn't charge the same amount per hour
Answer: I think the answer would be (2, -1)