Answer:
0
Step-by-step explanation:
By inspection or finding points, we see that 2nd ave is perfectly flat, or in other words, has slope of 0.
If line 1 is parallel to line 2, it means their slopes are the same.
So, the new road parallel to 2nd ave has a slope of
.
Product means to multiply. Integers are whole numbers, so the process would be to multiply the numbers.
Answer:
25%
Step-by-step explanation:
Let v, t be the current average speed and the time taken to reach the school respectively.
As distance = speed x time, so,
distance, d=vt...(i)
Let V be the new average speed in order to to take 20% less time than t.
So, time taken with speed V = t-20% of t = t- 0.2t= 0.8t
As distance is constant, so
d= V(0.8t)= 0.8Vt
hBy using equation (i), we have
0.8Vt = vt
0.8 V = v
V= v/0.8=1.25v
Therefore, the percentage increase in the average speed = 

=25%
Hence, the percentage increase in the average speed is 25%.
Answer:
A = 25pi m^2
Step-by-step explanation:
We know the diameter, we need the radius
r = d/2
r = 10/2 = 5
The area of a circle is given by
A = pi r^2
A = pi (5)^2
A = 25pi m^2
23 since the pattern rules is that we subtract by 3 each time