Answer:
the discount rate should be 10%
Explanation:
The computation of the discount rate should be given below:
The Amount of discount is is
= $50,000 - $48,750
= $ 1,250
The $1,250 should be for 90 days.
So for 360 days, it should be
= $1,250 × 4
= $5,000.
And, the discount rate is
= $5,000 ÷ 50,000 × 100
= 10%
Hence, the discount rate should be 10%
Answer:
D. Capacity
Explanation:
In order to applying for a loan, the financial institution analyze the borrower information in terms of creditworthiness i.e. collateral property, cash on hand, repayment conditions, status of the job. These factors should be based on the capacity of the borrower whether he or she is eligible for a loan or not
Therefore according to the given situation, the option D is correct and the same is to be considered
Answer:
D
Explanation:
Many studies have found a positive correlation between economic growth and living standards. This means that empirical works have found that countries with higher economic growth, often have better living standards than the countries with less economic growth. In this case if real GDP per capita of both countries is similar, then they are comparable.
We can deduce that the country B will experience an increase in living standards much more rapidly in the long run because economic growth leads to an increase in profits for firms, there would be a better capital and labor return. This means that firms will pay more for capital and labor, if households are de owners of capital and labor, their rents and wages will increase. The disposable income will increase for households and they will consume more goods and services, then their living standards will increase.
I think it's A. They decide to open a mattress drop off site, downtown, because the marginal, cost of the new location is less than the other projects.
Answer:
Requirement: <em>Determine the overhead rate for each activity "Materials handling, Machine setups, Quality inspections"</em>
<em />
Materials handling overhead rate = Total cost / Cost driver volume
Materials handling overhead rate = $30,000 / 1,000
Materials handling overhead rate = $30
Machine setups overhead rate = Total cost / Cost driver volume
Machine setups overhead rate = $23,750 / 475
Machine setups overhead rate = $50
Quality inspections overhead rate = Total cost / Cost driver volume
Quality inspections overhead rate = $19,000 / 475
Quality inspections overhead rate = $40