1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zhuklara [117]
3 years ago
12

Length of a sunflower seed

Mathematics
2 answers:
const2013 [10]3 years ago
6 0
<span>9·52 mm is the correct answer</span>
TiliK225 [7]3 years ago
3 0
"6.2% m.c.d.b., the average length, width, thickness and unit mass of the seed were 9·52 mm, 5·12 mm, 3·27 mm and 0·049 g respectively."
You might be interested in
How many more pepperoni pizza were sold than ham pizzas?
Crank

Answer:

20 more pizzas were sold

Step-by-step explanation:

60-40=20

5 0
2 years ago
Read 2 more answers
What is f(4) if f(x)=|3x+4|-2
alex41 [277]
Okay so just put the 4 in for x
and multiply

5 0
3 years ago
a garden table and a bench cost 806 combined. The garden table costs 44 less than the bench What is the cost of the bench?
Alexandra [31]
806 - 44 = 762.
762 divided by 2 = 381.
381 + 44 = 425. Hope it helps! :)
3 0
3 years ago
James has a mass of 32.8 kg. Ricardo's mass is 8 3/4 kg more than James's. Winthorp's mass is 3.6 kg less than Ricardo's. What i
strojnjashka [21]

Answer:79.5

Step-by-step explanation:32.8+8.75=41.55 41.55-3.6=37.95 37.95+41.55+32.8=79.5

3 0
3 years ago
8 men will take 10 days to build a wall 150 metres long. After the men had started working for 6 days, they were told that the w
Mashutka [201]
First, find out how much each man works. If eight men take 10 days to build 150 m of wall, then that means that it takes 80 man days to build 150 m. One Man day is then 150÷80, in other words 1.875. If eight men have already been working for six days, then they have spent 8×6 man days, 48. 48 men days times 1.875 m of wall per man day equals 90 m of wall have been built. So, you have four days left to build the remaining 60 m of wall as well as 45 extra meters, in other words, 105 m total. 105 m divided by four days equals 26.25 m need to be built every day. Since one man builds 1.875 m of wall every day, to find the number of men total you need for the last four days, take 26.25÷1.875, Which equals 14 exactly. 14 is not the answer however, because it’s asking how many more men you need. Since you already have eight, you need six more to make 14

The answer is six more men
3 0
3 years ago
Other questions:
  • What is the area of a circle with a diameter of 8?
    9·1 answer
  • Check my answers please
    9·1 answer
  • Right or not ???????????!!!?????????
    11·1 answer
  • Read the following step of solving a System of Equations problem and explain if it is correct or incorrect.
    15·1 answer
  • Evaluate F(x)=2x^2+5x-16 for x=4
    11·1 answer
  • Given the system<br><br> y &gt; -2<br><br> x + y &lt; 4
    13·1 answer
  • Which graph best represents the feasibility region for the system shown below?
    10·2 answers
  • Kaden says the number 13 is an irrational number. Which statement best explains whether Kaden is correct?
    11·2 answers
  • Solve each system by elimination<br> 7x + 8y = -29<br> -3x -8y = 17
    6·1 answer
  • What is 4/5 plus 2/3 and in simplest terms
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!