1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
aliina [53]
3 years ago
13

You are evaluating the risks associated with a construction project. Through careful analysis you have developed a list of the f

ollowing risks, probabilities those risks will happen, and the costs associated with them if they occur.
25% chance of Snowmaggedon which will delay the project at a cost of $35,000
10% chance of cost of construction materials dropping saving the project $70,000
10% probability a labor strike will occur delaying the schedule with a cost of $40,000
80% chance of new regulations mandated calling for higher inspection standards which will cost an additional $15,000 to mitigate
What is the EMV of this project?
Mathematics
1 answer:
poizon [28]3 years ago
5 0

Answer:

The EMV of this project is -17,500

Step-by-step explanation:

The EMV of the project is the Expected Money Value of the Project.

This value is given by the sum of each expected earning/cost multiplied by each probability.

So, in our problem

EMV = P_{1} + P_{2} + P_{3} + P_{4}

The problem states that there is a 25% chance of Snowmaggedon which will delay the project at a cost of $35,000. Since this is a cost, P_{1} is negative.

P_{1} = 0.25*(-35,000) = -8,750

There is a 10% chance of cost of construction materials dropping saving the project $70,000. A saving is an earning, so P_{2} is positive

P_{2} = 0.10*70,000 = 7,000

There is a 10% probability a labor strike will occur delaying the schedule with a cost of $40,000.

P_{3} = 0.10*(-40,000) = -4,000

There is a 80% chance of new regulations mandated calling for higher inspection standards which will cost an additional $15,000 to mitigate

P_{4} = 0.80*(-15,000) = -12,000

EMV = P_{1} + P_{2} + P_{3} + P_{4} = -8,750 + 7,000 - 4,000 - 12,000 = -17,500

The EMV of this project is -17,500

You might be interested in
Solve the system of inequalities and indicate all the integers which are in the solution set:
Greeley [361]

Answer:

-5 < a < 3.4

Step-by-step explanation:

3 - 2a < 13

3 - 13 < 2a

2a > -10

a > -5

5a < 17

a < 3.4

Solution:

-5 < a < 3.4

6 0
3 years ago
Read 2 more answers
Please help I have 15 minutes!!!!!!!
DedPeter [7]

Answer:

NO WAIT NO IGNORE MY PREVIOUS ANSWER

NOT A FUNCTION

If you draw vertical lines on the dotted line, one line will intersect two parts of the dotted line, so it is not a function.

6 0
3 years ago
Which will result in a difference of squares?
SIZIF [17.4K]

Answer:

The expression which will result in difference of two squares is:

 (–7x + 4)·(–7x – 4)

Step-by-step explanation:

We know that the formula of the type:

(a-b)(a+b)=a²-b²

i.e. it is a difference of two square quantities. (a^2 and b^2)

since,

a= -7x , b=4

(-7x+4)(-7x-4)= (-7x)² - (4)²

=(7x)² - 4²

So the expression is a difference of two square quantities:

(7x)² and (4)²

Hence the answer is (–7x + 4)·(–7x – 4)....

5 0
3 years ago
What is the answer to 25% of 50
a_sh-v [17]

Answer:

12.5

Step-by-step explanation:

.25 x 50= 12.5

8 0
2 years ago
Enter the slop-intercept equation of the like that has slope -2 and y-intercept (0,7)
LenaWriter [7]

Answer: y= 2x + 7

Step-by-step explanation:

Slope intercept form = y= mx + b

You are given slope (m=2) and a point (0,7) so

7 = 2(0) + b

7 = b;

So your equation is y= 2x + 7

4 0
4 years ago
Other questions:
  • PLEASE HELP ASAP LMNO is a square and length of MN is 8 meteres. What is the length of LM?
    11·2 answers
  • What’s the answer to this question
    7·1 answer
  • What is 8.038 x 10 to the 8th power in standard form
    12·1 answer
  • The area of a rectangle is 20x^2-27x-8.the length is 4x+1. What is the width?
    8·2 answers
  • Andrea has 18 yards of fabric. how many 4 inch pieces can she cut from her original piece? please explain
    5·2 answers
  • I NEED ANSWER TO THIS!! POINTS
    5·1 answer
  • What are two different word phrases for the expression t/30 ?
    13·1 answer
  • Which equation can be used to find the length of AC?
    9·1 answer
  • It's been found that there is a 15% chance that you can win a particular game. How many "wins" would you have if you played 40 t
    8·2 answers
  • On Planet Galactica, common units of distance are alpha, beta, and gamma. 4 gammas equal 5 betas. 2 betas equal 3 alphas. How ma
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!