In the Programming stage of the system development life cycle, the design specifications are translated into computer code
I'd say the
Arrange tab
Sizing and moving fields in design view can sometimes be
time consuming. Be that as it may, we can always use the tab order dialog box
to perform this operation. To do so, we select the labels and fields in
question, proceed to the Arrange tab, sizing and ordering group and then click
on the Align button.
There are different kinds of software implementation strategy. The software implementation strategy would you recommend in this situation to allow users fall-back access to the old system as the new one is implemented is parallel start up.
- Parallel running often called parallel start up strategy for system changeover where a new system slowly takes over the roles of the older system even when both systems operate.
This conversion often occur when the technology of the old system is outdated and as such a new system is needed to be installed to replace the old one.
The parallel running phase is the act of changing a fragment of business information technology operation to a new system.
Learn more about Parallel start up from
brainly.com/question/9343211
Answer:
insert, illustrations, click and drag, slide show
Explanation:
i got it right
Answer:
ADMINISTRATIVE CONTROL
Explanation:
If a potential employee is required to undergo a drug screening an Administrative Control is what will be conducted on the employee because
Administrative controls are training, procedure, policy that limit or prevent exposure of an individual to hazards. Examples of administrative controls include training, supervision, timing of work. Administrative controls are also changes in work procedures such as written safety policies, rules, supervision which is the reason the employee has to undergo drug screening using Administrative controls.