Time taken by Michelle to complete the work alone = 6 hours
Time taken by Nancy to complete the work alone = 3 hours
Now, when they both are working on the same job for 1 hour,
Amount of job completed = (1/6) + (1/3)
= (1 + 2)/6
= 3/6
= 1/2
So in 1 hours time they both will complete half of the job. Then in 2 hours Michelle and Nancy will complete the total job. I hope the answer has come to your help.
Answer:
C) y+7 = -2/3(x-1)
Step-by-step explanation:
You have to change the signs of the x and y coordinates...
x = 1 is the same as (x-1)
y = -7 is the same a (y+7)
Answer:
Neither
Step-by-step explanation:
To verify, we substitute the values in the equations:
however, the value should be 4. Hence this equation does not satisfy the co-ordinate.
however, the value should be 4. Hence this equation does not satisfy the co-ordinate.
I suppose you mean the length of the rectangle is 9x2,
so the area calculated is 117 sq ft. so 117 / 18 makes 6.5, therefore the width is 6.5 ft.
Step-by-step explanation:
the opposite side is AC