Answer:
d. Cannot be determined with the information provided.
Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Finding the better relative position:
The score with the better relative position is the one with a higher z-score.
To find the z-score, the mean and the standard deviation is needed, and in this question, the standard deviation is not given, and thus, the correct answer is given by option d.
All you need to do is divide -1/2 onto the other side.
-1/2x<-12
-12/ (-1/2)= 6 (a negative and a negative equals a positive)
Also, since you are dividing a negative, you flip the sign.
x>6
I hope this helps!
~cupcake
<h3>✽ - - - - - - - - - - - - - - - ~<u>Hello There</u>!~ - - - - - - - - - - - - - - - ✽</h3>
➷ Divide total cost by the number of files:
82.50/30 = 2.75
Multiply by 10:
2.75 x 10 = 25.5
The cost was $27.50
➶ Hope This Helps You!
➶ Good Luck (:
➶ Have A Great Day ^-^
↬ ʜᴀɴɴᴀʜ ♡
C = 10m + 30, where C is total cost and m is # of months
C = 10(5) + 30
C = 50 + 30
C = $80
$160 = 10m + 30
160 - 30 = 10m
130/10 = m
m = 13 months
Hope that helps
267 is what the answer is sorry if it’s wrong