Answer:
All of the above
Explanation:
An interrupt priority scheme is a system which decides the priority at which various work is done and it perform all of the above mention task so therefore all of the above is the right answer.
Answer:
where is the picture?????
Answer:
top down approach
Explanation:
Top down approach is process of breaking down system into sub-system which helps in formulating the overall system. At the end every sub system can be refined with more details.
While bottom up approach is process of gathering systems to design large complex system.
Top down is better as basic information is present and resources can be utilized effectively without impacting maintennance and operations.
Answer:
I mean I need points but I'm not sure my advice is to look it up or look on y0utube : )
Explanation: