Answer:
CI = 29.8 ± 3.53
Critical value is z = 2.58
Step-by-step explanation:
First of all let's find margin of error. It is given by the formula;
ME = zσ/√n
We are given;
Standard deviation; σ = 3.62
Sample size; n = 7
Mean; x¯ = 29.8
Now, z-value for 99% Confidence level is 2.58
Thus;
ME = (2.58 × 3.62)/√7
ME = 3.53
CI is written as;
CI = x¯ ± ME
CI = 29.8 ± 3.53
Critical value is z = 2.58
Answer:
17/20
Step-by-step explanation:
Total no. of beads = 6 + 3 + 11 = 20
We need RED or GREEN bead .
So no. of beads needed = 6 + 11 = 17
So probability of getting GREEN or RED beads = 17/20
Answer: B) 5 days
Explanation: 2 weeks is equal to 14 days. If you do 14 - 9 you get 5, which is equal to the amount of days after the due date.
You can solve them in the same way. you can add any positive or negative number to both the sides of an inequality.Also you can multiply or divide both sides of an inequality by any positive number hope this helps. :)
Answer:
0.4
Step-by-step explanation:
P(A)+P(B)=P(AUB)