Answer:
total cost= $5,814
Step-by-step explanation:
Total linear feet measured: (110 x 2) + (270 x 2) = 760 linear ft
total sq ft= 760 x (7) = 5320 sq ft
total linear ft x labor= 760 x 1.70 = 1292 labor
Total sq ft x Cyclone fencing cost= 5320 x .85 = 4522
the total cost is 1292 + 4522 = $5,814